Chest suggestions Up the 50% to 75% drop the name change orders

Stop being greedy loot goblins. If you are going to bleed the players of money then at least offer a better return than a mob run poker game with the players being the patsy’s. 5k for 50% it equals maybe 1-2k in the game. some of us have spent MILLIONS of silver (At least 5 since chests started) and the return has been honestly >SHITTY<. “Do better” we waste so many resources that take weeks to generate on garbage prizes that return if lucky 20%. If you have awesome prizes at a higher chance people will spend more. It is not even real money making it double cringe at how hard you are clutching those silver chest pearls on something that has no monetary downside (assuming the plan is not based on people buying squads instead). I get it that it is gambling. but they introduced the mechanic so long term players have something to do with all their extra silver they generate (I have 86 days of play). I have set a hard limit now on chest 800k silver always in the bank and anything less will NEVER be spent on chests. It is a better investment to fill out multiple BRs on multiple factions. It takes about 25k+ to get a Tier 4 soldier if you are lucky. I see 1/10 being 3 Stars at 5k a pop with a 4300 return. Add the weapon upgrades and kitted out another 5k. Seem that is a better investment than 2k Name change orders. I wonder who has the most of those? Come on everyone post your name change count! 555 (That would be HA HA HA in Thai ironic) Name change orders, and since I skipped Marshall last time I am now under a year in the Marshall reward department :frowning: The constant is the Battle Pass and Premium with slots also being a good value when they are on sale (May should have one) together they are worth the purchase. I get a year at a time. But not a chance I am spending 30+(5-10$ price point is a much better income generation cycle) dollars on a squad when there is plenty of great content already without the need for specificity. Some bean counter understands it is better to sell 4-5 units at 10 than 1 unit at 30. I can’t imagine the demand is that high on something that costs more than a Total war DLC, Ubisoft DLC, Fallout 4 DLC, heck even Cyber punk is 20$ for its two DLC’s and I am 100% sure that content is superior.




That is soooo many days!

5 Likes

My friend, in short: gamble responsibly and don’t become overly addicted. :slightly_smiling_face:

1 Like

It is not about that. It is that they introduced a method to make excess silver useful. They are too tight with their odds. It is just poor taste when you could actually be a little less of a greedy loot goblin and build some good sentiment with the players. I am over the chests and only get them if I need an exp boost. Casinos run on returning players not sucking them dry and leaving a husk. They took a great system with gold orders and replaced it with this garbage. So if you think that is a better option than Gold Orders there is not much I can do. They buggered they entire player base using sand as lube when they got rid of Gold orders. No one asked them too and it was a try and bleed the players in hope they will spend RL money for crap. The only thing they accomplished was losing even more of their player base and pissing off the players. I have not seen one person go “That random crappy casino is sooo much better than actually being able to purchase what you like and need”. Who needs a Condor when you can get 10000 name change orders. It is a shitty tactic abusing human behavior.

Here are two suggestions: (1) You can log in to the game more frequently to complete daily tasks and accumulate silver coins, but don’t spend too much money on silver coin chests except for discounts in the official store. (2) Open silver coin chests one by one instead of opening them all at once. After all, gambling relies on luck, not on getting all the rewards at once.